Essential resurfacing work on the A39 at Walton

By Tim Lethaby

16th Jul 2021 | Local News

A major scheme to resurface a key road between Bridgwater and Street is planned to take place later this month.

The A39 Main Street at Walton is showing signs of deterioration with numerous cracks and potholes on the carriageway.

The scheme is the second phase of works at this location which was split to reduce the length of the works and minimise disruption.

Cllr John Woodman, Somerset County Council Cabinet member for Highways, said: "This is the next stage of essential works to improve this key road.

"We've done our best to keep disruption to a minimum by splitting the scheme into phases and planning the road closure for half-term when there is less traffic on the road. However, we appreciate it's a very busy route so please do check the details carefully and plan ahead."

The scheme is primarily resurfacing and will include minor repairs to the existing drainage systems, excavation and removal of soft spots and kerb repairs over a 300m stretch of road.

Following consideration of all options at the design stage, the three-week scheme has been split into phases:

Weeks 1 & 2 (14 – 27 October): Road open for prep works with traffic controlled by temporary traffic signals where required.

Week 3 (28 October – 1 November): Road fully closed for resurfacing between 7.30am and 5.30pm.

Access to households and businesses within the village will be maintained by liaison with on-site staff. Every effort will be made to keep the duration of the works to a minimum and pedestrian access will be maintained.

During the road closure a suggested diversion route will be clearly signposted on site or can be found at www.travelsomerset.co.uk/roadworks. Stay up to date with this and other roadworks schemes by following @TravelSomerset on Twitter.

Somerset County Council looks after more than 4,000 miles of road and in 2018/19 invested £24.7 million to keep the county moving, including filling 18,519 potholes and delivering 385 highway maintenance schemes ranging from drainage works to carriageway and footway resurfacing

     

New glastonbury Jobs Section Launched!!
Vacancies updated hourly!!
Click here: glastonbury jobs

Share:

Related Articles

Spectators braved drizzle at the start of the Glastonbury Carnival 2024, but the parade ended on a drier note for many.
Local News

Relive the Glastonbury Carnival 2024 spectacle

Carnival lights up the night in Glastonbury (All photos: LL/BJLILU)
Local News

Glastonbury Carnival 2024: Results revealed as local clubs shine

Sign-Up for our FREE Newsletter

We want to provide glastonbury with more and more clickbait-free local news.
To do that, we need a loyal newsletter following.
Help us survive and sign up to our FREE weekly newsletter.

Already subscribed? Thank you. Just press X or click here.
We won't pass your details on to anyone else.
By clicking the Subscribe button you agree to our Privacy Policy.